The sea part of the "Gökçebel Marina and Social Facilities "project; in total a 540 m long main breakwater, a floating quay of 360m long secured by the breakwater and a 8615m2 of fill area and a 206 m quay in front of the fill area.
A breakwater of 630m will be manufactured in addition, - repair and strengthening among 500 m on the main breakwaters. Boat binding capacity has been increased from 1010 to 1700…
Designing of the marina with 400 yachts capacity in the coast, and a yacht club with social facilities and an exhibition area on the floating platform.
Turkish State Railways (TCDD) Derince Container Port Project
The existing berthing dock will be organized according to the container port project.
According to the project, an east-west strike dock of approximately 1000meters (water depth between -12 -15), and of a north-south strike dock of approximately 460 meters (scanned to -7 -12 water depth) will be made.
A breakwater of 630m will be manufactured in addition, - repair and strengthening among 500 m on the main breakwaters. Boat binding capacity has been increased from 1010 to 1700…
Mersin Atas Pier structural analysis report was carried out by 3 dimensional computer based modeling. Bearing capacity of the structure was calculated for earthquake and other potential loads.
Designing of the marina with 400 yachts capacity in the coast, and a yacht club with social facilities and an exhibition area on the floating platform.
A breakwater of 630m will be manufactured in addition, - repair and strengthening among 500 m on the main breakwaters. Boat binding capacity has been increased from 1010 to 1700…
In case of accidents which may occur in marine and coastal areas, as a company, we are providing advisory services such as risk assessments, emergency response plans, creation of maps of sensitivity and in environmental protection issue we are presenting new and natural solutions.